Ops Manager Learn 2: Build and Calibrate
4. Assembly
- Flip the GoPiGo3 onto its back.
- Position the line follower sensor so the sensors are at the back, near the motors and wheels, and the Dexter logo is facing the front.
- Use the remaining bolts to loosely attach the sensor to the posts.