Ops Manager Learn 2: Build and Calibrate

4. Assembly

          • Flip the GoPiGo3 onto its back. 
          • Position the line follower sensor so the sensors are at the back, near the motors and wheels, and the Dexter logo is facing the front.
          • Use the remaining bolts to loosely attach the sensor to the posts.